37% of automation deployments underperform because of the slab, not the software. Thirteen short questions and we'll come back with a readiness view of your floor - plus the tolerances your equipment actually has to hit.
13 questions · about 2 minutes · no obligation
Your site
What best describes what is happening at your site right now?
This sets which tolerance standard your report is written against.
Your role
What role do you have in this project?
So the summary is written for the right reader.
Your equipment
Which equipment has to perform on this floor?
Every platform has its own tolerance envelope - an AMR forgives what would stop a VNA truck dead.
Your floor
What is the floor situation today?
Tells us whether this is a verification, a correction or a specification job.
Your floor
What are you seeing – or most concerned about?
Whatever you flag here is what the specialist checks first on site.
Select up to 3
Floor data
What technical floor information do you already have?
Anything you already hold saves survey time. Select everything that applies.
Select all that apply
History
Has anyone already tested or repaired the floor for this automation project?
Previous attempts change what we look for.
Access
How much access can the floor team realistically get?
Access drives how the work gets phased.
Timing
When does the floor need to be ready?
Floor works sit on the critical path. The earlier we know, the less it costs.
Your readiness
Where should we contact you about your floor readiness?
We will provide you with the customized information required for you to make the best decision for your floor.
Scale
How much floor is involved?
A rough number is fine - we're sizing the survey, not quoting the works.
Next step
What would be most useful from AppliedeX next?
Commercial
Where is the project commercially?
So we bring the right level of detail.
Decision
What role do you play in the next decision?
So we bring the right people to the call.
Your details
Last one - who should we address it to?
We use this to prepare the report. Nothing is shared outside AppliedeX.
Scoring your floor
Assessed for
We'll call you within the day.
Everything about this points to work that needs to start. A floor specialist will call you today with a survey slot and an outline scope.
You have a real timeline and a live budget path. We'll put a budget estimate for your slab together so the number is in front of your approver before anyone needs it.
Still time to design the floor around the equipment instead of correcting it afterwards. We'll send the tolerance spec for your equipment and a planning checklist.
Nothing urgent on your floor yet. We'll send the Automation Floor Readiness guide so the slab is a solved problem long before the equipment is ordered.