AppliedeX
Joint spalling on a warehouse slab

Floor Readiness Assessment

Is your floor ready for automation?

37% of automation deployments underperform because of the slab, not the software. Thirteen short questions and we'll come back with a readiness view of your floor - plus the tolerances your equipment actually has to hit.


13 questions · about 2 minutes · no obligation

Your site

What best describes what is happening at your site right now?

This sets which tolerance standard your report is written against.

Your role

What role do you have in this project?

So the summary is written for the right reader.

Your equipment

Which equipment has to perform on this floor?

Every platform has its own tolerance envelope - an AMR forgives what would stop a VNA truck dead.

Your floor

What is the floor situation today?

Tells us whether this is a verification, a correction or a specification job.

Your floor

What are you seeing – or most concerned about?

Whatever you flag here is what the specialist checks first on site.

Select up to 3

Floor data

What technical floor information do you already have?

Anything you already hold saves survey time. Select everything that applies.

Select all that apply

History

Has anyone already tested or repaired the floor for this automation project?

Previous attempts change what we look for.

Access

How much access can the floor team realistically get?

Access drives how the work gets phased.

Timing

When does the floor need to be ready?

Floor works sit on the critical path. The earlier we know, the less it costs.

Your readiness

Where should we contact you about your floor readiness?

We will provide you with the customized information required for you to make the best decision for your floor.

Scale

How much floor is involved?

A rough number is fine - we're sizing the survey, not quoting the works.

Next step

What would be most useful from AppliedeX next?

Commercial

Where is the project commercially?

So we bring the right level of detail.

Decision

What role do you play in the next decision?

So we bring the right people to the call.

Your details

Last one - who should we address it to?

We use this to prepare the report. Nothing is shared outside AppliedeX.

Scoring your floor

A remediated slab verified to DM1

Assessed for

We'll call you within the day.

Everything about this points to work that needs to start. A floor specialist will call you today with a survey slot and an outline scope.

Book my site assessment

A specialist will be in touch.

You have a real timeline and a live budget path. We'll put a budget estimate for your slab together so the number is in front of your approver before anyone needs it.

Book a scoping call

There's time to get the spec right first.

Still time to design the floor around the equipment instead of correcting it afterwards. We'll send the tolerance spec for your equipment and a planning checklist.

Talk it through with a specialist

Here's the groundwork.

Nothing urgent on your floor yet. We'll send the Automation Floor Readiness guide so the slab is a solved problem long before the equipment is ordered.

Ask a specialist a question
Prefer to start over?

How Ready Is Your Floor For Automation?