Learn about the flooring, concrete, and automation‑readiness challenges shaping today’s high‑performance industrial facilities. We break down practical insights, field experience, and emerging technologies that help warehouses prepare their floors for AGVs, AMRs, VNA systems, and next‑generation automation.
At a facility in Niagara Falls, a severely deteriorated 30,000-square-foot concrete slab was successfully converted into a high-precision automation platform for HAI Robotics in two weeks. Rather than replacing the slab entirely, AppliedeX executed a...
Selection Process The Hockey Arena was seeking a long-term solution for highly trafficked pathways for ice-resurfacer ride-on machines (Zambonis). They wanted a permanent solution with a long warranty. AppliedeX chose the Ucrete IF flooring system...
Selection Process Amica was tired of the maintenance frequency associated with the consistent failure and degradation of their existing flooring within the kitchens, service areas, hallways and surrounding spaces. AppliedeX was contacted for a flooring assessment...
Selection Process As Google chips away at the new construction of their new 400,000 sq ft office in Downtown Toronto, one flooring requirement for their cafeterias, kitchens, mechanical rooms, change rooms, washrooms, and more were...
Selection Process Coca Cola required a chemical-resistant, non-slip floor that was easy to clean due to sugary spills and their forklift-bearing drain system. AppliedeX recommended a polished concrete, followed by a 3-coat Epoxy/ Polyurethane Glass...
Selection Process Home Hardware had expressed interest in a decorative flake system for a renovation in the entrance vestibule at one of their large stores in Ontario. They had installed a decorative flake system in...
Selection Process Having had worked with the Maximum Motorsports team in Ottawa in the past, the owners approached us to help them transform 2800 sq ft of old Terrazzo flooring in their space into a...
Selection Process Located on the eastern edge of beautiful Norfolk county is one of the areas oldest 100-acre boutique winery & cider mill named Villa Nova Estates. New owners have just purchased the property, however...
Selection Process When the University of Toronto’s CCBR building won the Royal Institute of British Architects (RIBA) International Award in 2006, one of the judges simply noted, “This building says, “Science matters.” The CCBR Building...
Selection Process High performance was a must when it came to selecting the right coating system for University of Western Ontario’s animal care facility. The architects of the project took note of Tnemec’s presence in...
How Ready Is Your Floor For Automation?